  Manufacturing Facilities

Company Profile    Manufacturing Facilities    Quality Assurance System
1) Slitting Process
1) Slitting Process
 
2) Stitching & Winding
2) Stitching & Winding
 
3) Drying
3) Drying
4) Dipping (Evacuation & Vacuumization)
4) Dipping (Evacuation & Vacuumization)
 
5) Assembling
5) Assembling
 
6) Inspection For Stitching & Winding By X-Ray Scanner X
6) Inspection For Stitching & Winding By X-Ray Scanner X
7) Sleeve
7) Sleeve
 
8) Aging: Test All Characteristics at High Temp. & Pressure
8) Aging: Test All Characteristics at High Temp. & Pressure
 
9) Final Quality Inspection: Inspect Characteristics (Capacitance, Leakage Current & Dissipation Factor)
9) Final Quality Inspection: Inspect Characteristics (Capacitance, Leakage Current & Dissipation Factor)
10) Visual Inspection
10) Visual Inspection
 
11) Taping (Inspect Capacitance, Leakage Current & Dissipation Factor Simultaneously)
11) Taping (Inspect Capacitance, Leakage Current & Dissipation Factor Simultaneously)
 
12) Lead Wire Cutting
12) Lead Wire Cutting
13) Warehouse
13) Warehouse